UST Service Details
Well and Treatment System Installations
Service options can include the following items:
- AEM will install eight (8) 6-inch diameter recovery wells and nine (9) two inch diameter monitor wells (piezometers).
- Install recovery well manholes and piezometers.
- Install systems (2) with associated electrical connections and plumbing including trenching and locking privacy fences.
- Provide installation Documentation Report.
Monitor Well Installations
Service options can include the following items:
- Provide weekly site visits.
- Provide quarterly site visits with sampling and quarterly report.
Spill Prevention Countermeasures and Control Plan (SPCC)
AEM can perform a Spill Prevention Countermeasure & Control Plan (SPCC) relative to Underground Storage Tank projects in full accordance with Georgia EPD and US EPA Regulations. The SPCC Plan will be prepared as required by a Georgia Registered Professional Engineer.